HOBO MicroRX Water Level Station with Solar
HOBO MicroRX Water Level Station with Solar
HOBO MicroRX Water Level Station with Solar
DESCRIPTION
Data Plan required. Select from User-Provided Data Plan (89705), Global Limited Data Plan (89708), or Global Max-Connect Data Plan (89709).
Operating Range: -20° to 60°C (-4° to 140°F). Battery Type/Power Source: Integrated 1.7 watt solar panel and NiMH rechargeable battery pack; optional AC power adapter or external solar panel can be used in place of integrated solar panel. Battery Life: Typical 3–5 years when operated in the temperature range -20° to 40°C (-4° to 104°F); operation outside this range will reduce the battery service life.
The HOBO MicroRX Water Level Station is a cellular, web-enabled water level monitoring solution for stormwater, floodwater, irrigation, hydrologic, and environmental applications. Two power source options are available: a solar panel for extended deployments, and user-replaceable batteries for flexible mounting in covered or protected locations. The station has pre-programmed water flow formulas for select weirs, flumes, and a stage discharge table allowing for an easy and intuitive configuration. New water flow and accumulated rainfall calculations, which are performed directly on the station at time of measurement, trigger immediate notifications of critical water level conditions. The compact and durable station, together with the non-vented water level sensor, enables harsh condition deployments and reliable monitoring. The station is compatible with Onset’s wide range of plug-and-play smart sensors allowing for flexible environmental monitoring. Also features a built-in LCD to confirm setup and operation. Onset’s cloud-based HOBOlink platform makes it easy to view, access, and share data with up to 10 minute connection rates via 4G cellular data plans. The MicroRX Weather Station is housed in a weatherproof IP66/NEMA 4X enclosure. 3-point NIST-traceable calibration certificate is included for the water pressure sensor.
Note: A data plan is required.